Clam Corp Fish Trap 8323 User Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 10
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
9
To set” the tent, grasp the tent material at the rear of the shelter and pull it downward. Observe the
porch area of the tent lifting accordingly as you pull. When the U-Channel molding is correctly installed,
the porch hoop pole will lightly touch the floor.
To achieve this condition, start by finding the center of the molding. From behind the unit, pull the
midpoint of the tent downward and fold the tent material under the base lip. Press the midpoint of the
molding over the tent material and base lip. Continue pressing outward in both directions until you have
secured about twelve inches of molding onto the base.
Having temporarily secured the tent to the base, take a walk around the unit. Readjust the molding until
you have verified the proper porch hoop pole position and also that the tent sides and corners are
properly proportioned.
When satisfied, continue applying the molding around the shelter, one direction from center and then the
other, pulling the material as you go so that surface is relatively wrinkle-free and snug. Use a side cutters
to trim the ends of the molding if they are not equal relative to base.
Reinstall the rear adjustable spreader pole to tighten the fit of the tent. If everything still looks good,
secure the molding with the #6 phillips screws. Evenly space them about every ten to twelve inches, and
also put a screw in the center of both corners. Since there aren’t any predrilled holes, it's advisable to
use a powered driver for this operation.
- Tips for Use -
IMPORTANT:
Trim
the edge
of the molding so it ends
approximately 6 inches behind
the centerline seam on both sides
of the shelter.
6”
6”
Page view 8
1 2 3 4 5 6 7 8 9 10

Comments to this Manuals

No comments